Individual skill
verification
Verification-before-completion discipline ensuring all success criteria are met, tests pass, and reviews complete before declaring work done.
library/methodologies/rpikit/skills/verification/SKILL.md
Source commit feb68abe397acc14f32b34984975c48fedba2b33
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 3, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,898
- Repository last updated
- Nov 1, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- agent-orchestration Repository topic
- agent-skills Repository topic
- agentic-ai Repository topic
- agentic-workflow Repository topic
- ai-automation Repository topic
- babysitter Repository topic
- claude-code Repository topic
- claude-skills Repository topic
- trustworthy-ai Repository topic
- vibe-coding Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
- At phase checkpoints
- Before final completion declaration
- When validating that all acceptance criteria are met
## Verification Checklist
1. All automated tests pass
2. Manual verification steps confirmed
3. Code review completed (APPROVE or APPROVE_WITH_NITS)
4. Security review passed
5. Plan document updated with completion status
6. All success criteria from the plan are satisfied
7. No untracked deviations from the plan