Individual skill

project-sizing-guide

Software project effort estimation assistant. Outputs three-point estimates (optimistic/most-likely/pessimistic values with confidence intervals), T-shirt sizes, or Function Point Analysis (FPA) counts. Triggered when users ask 'how long will this feature take,' need to assess project workload, perform PERT estimation, T-shirt sizing, FPA, sprint planning, or quote-based effort breakdowns.

skills/project-sizing-guide/SKILL.md

Read pinned source

Source commit 3ae17b2c765ed8534ba9c6f848563db127fc4ca6

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 7, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
4,700
Repository last updated
Nov 7, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Project Sizing Guide — Software Project Effort Estimation

Helps teams produce scientifically grounded effort estimates for software projects, based on three major methodologies: Three-Point Estimation (PERT), T-shirt Sizing, and Function Point Analysis (FPA). Outputs optimistic, most-likely, and pessimistic values along with risk intervals.

## Quick Start

1. **User provides a requirements description** → Agent identifies functional modules and breaks them into a Work Breakdown Structure (WBS)
2. **Select an estimation method** → Choose the best-fit approach based on project stage and available information
3. **Estimate each item** → Assign O/M/P (Optimistic / Most Likely / Pessimistic) values to every work package
4. **Aggregate and report** → Generate an estimation report with risk analysis and confidence intervals

A calculation helper is available:
```bash
python3 scripts/estimate_calculator.py --method pert --tasks '[{"name":"User Login","O":2,"M":3,"P":8}]'