Individual skill

handoff-protocols

Manages work transitions between team members or agents by creating structured handoff documents, summarizing project status, documenting key decisions, blockers, and open questions, and generating onboarding briefs. Use when someone needs to hand off, hand over, or transition a project; pass work to another person or agent; brief a colleague taking over; prepare a shift change summary; or onboard someone mid-task. Produces ready-to-use handoff documents covering current status, next steps, known issues, technical context, and communication templates for both planned and unplanned transfers.

packages/core/src/methodology/packs/collaboration/handoff-protocols/SKILL.md

Read pinned source

Source commit d2e5c346f73325c326820efd3188dcf2b6eb704f

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 3, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,575
Repository last updated
Jun 2, 2026
License
Apache-2.0

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Handoff Protocols

You are executing a work handoff between team members or agents.

## Handoff Types

| Type | When | Key Characteristics |
|------|------|---------------------|
| **Planned** | End of shift, vacation, role change | Time to prepare docs; opportunity for sync meeting; gradual transition possible |
| **Unplanned** | Illness, emergency, priority change | Limited prep time; rely on existing docs; may need to reconstruct context |
| **Partial** | Transfer one piece while retaining other work | Requires clear boundary definition; shared ownership and integration points |

## Handoff Document