Individual skill

subagent-driven-development

Use when executing implementation plans with independent tasks in the current session

skills/subagent-driven-development/SKILL.md

Read pinned source

Source commit 22f0b463e7a5e579904dd6211a520321035526f7

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 6, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
313,871
Repository last updated
Nov 3, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Subagent-Driven Development

Execute plan by dispatching a fresh implementer subagent per task, a task review (spec compliance + code quality) after each, and a broad whole-branch review at the end.

**Why subagents:** You delegate tasks to specialized agents with isolated context. By precisely crafting their instructions and context, you ensure they stay focused and succeed at their task. They should never inherit your session's context or history — you construct exactly what they need. This also preserves your own context for coordination work.

**Core principle:** Fresh subagent per task + task review (spec + quality) + broad final review = high quality, fast iteration

**Narration:** between tool calls, narrate at most one short line — the
ledger and the tool results carry the record.

**Continuous execution:** Do not pause to check in with your human partner between tasks. Execute all tasks from the plan without stopping. The only reasons to stop are the four named below, or all tasks complete. "Should I continue?" prompts and progress summaries waste their time — they asked you to execute the plan, so execute it.

**Rulings, not stalls.** A running plan does not wait on a human. Conflicts,