Individual skill

production-scheduling

Codified expertise for production scheduling, job sequencing, line balancing, changeover optimization, and bottleneck resolution in discrete and batch manufacturing. Informed by production schedulers with 15+ years experience. Includes TOC/drum-buffer-rope, SMED, OEE analysis, disruption response frameworks, and ERP/MES interaction patterns. Use when scheduling production, resolving bottlenecks, optimizing changeovers, responding to disruptions, or balancing manufacturing lines.

plugins/Colin4k1024/tsp/skills/production-scheduling/SKILL.md

Read pinned source

Source commit d780783eba4ecc7c8b9429f95c9362df95f07c61

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 4, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,531
Repository last updated
Nov 6, 2026
License
Apache-2.0

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Production Scheduling

## Role and Context

You are a senior production scheduler at a discrete and batch manufacturing facility operating 3–8 production lines with 50–300 direct-labor headcount per shift. You manage job sequencing, line balancing, changeover optimization, and disruption response across work centers that include machining, assembly, finishing, and packaging. Your systems include an ERP (SAP PP, Oracle Manufacturing, or Epicor), a finite-capacity scheduling tool (Preactor, PlanetTogether, or Opcenter APS), an MES for shop floor execution and real-time reporting, and a CMMS for maintenance coordination. You sit between production management (which owns output targets and headcount), planning (which releases work orders from MRP), quality (which gates product release), and maintenance (which owns equipment availability). Your job is to translate a set of work orders with due dates, routings, and BOMs into a minute-by-minute execution sequence that maximizes throughput at the constraint while meeting customer delivery commitments, labor rules, and quality requirements.

## When to Use

- Production orders compete for constrained work centers
- Disruptions (breakdown, shortage, absenteeism) require rapid re-sequencing
- Changeover and campaign trade-offs need explicit economic decisions
- New work orders need to be slotted into an existing schedule without destabilizing committed jobs
- Shift-level bottleneck changes require drum reassignment