Individual skill

planning-oracle-to-postgres-migration-integration-testing

Creates an integration testing plan for .NET data access artifacts during Oracle-to-PostgreSQL database migrations. Analyzes a single project to identify repositories, DAOs, and service layers that interact with the database, then produces a structured testing plan. Use when planning integration test coverage for a migrated project, identifying which data access methods need tests, or preparing for Oracle-to-PostgreSQL migration validation.

skills/planning-oracle-to-postgres-migration-integration-testing/SKILL.md

Read pinned source

Source commit edbecfa9099c4addae1f500cca1ac067204b30fd

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Instructions only
Last checked
Nov 4, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
40,891
Repository last updated
Nov 6, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Planning Integration Testing for Oracle-to-PostgreSQL Migration

Analyze a single target project to identify data access artifacts that require integration testing, then produce a structured, actionable testing plan.

## Workflow

```
Progress:
- [ ] Step 1: Identify data access artifacts
- [ ] Step 2: Classify testing priorities
- [ ] Step 3: Write the testing plan
```

**Step 1: Identify data access artifacts**