Individual skill

porting-start-milestone

Begin the next milestone. Reads the goal document and latest handoff note, loads relevant skills, studies code paths, and produces a preparation summary for user review. Does NOT write code.

game-porting-skills/skills/porting-start-milestone/SKILL.md

Read pinned source

Source commit 4f42344c90be22112f46becc3fb9687f423f2f88

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Instructions only
Last checked
Nov 5, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
220
Repository last updated
Jun 8, 2026
License
Apache-2.0

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

You are entering Phase 1: Prepare for the current milestone.

## Pre-flight Check

Locate the agent's **artifact directory** at `<project-root>/.porting/` (defined in `porting-methodology`). All artifacts live there. Load the `porting-methodology` skill if not already in context.

1. **Check for a goal document** (`goal-*.md` in the artifact directory). If none exists, tell the user: "No goal document found. Run `/porting-plan-goal` first." and stop.

2. **Read the goal document.** Find the first milestone with status "Not started" or "In progress":
   - If one is "In progress", resume it.
   - If one is "Not started", start it — update its status to "In progress" in the goal document.
   - If all milestones are complete, tell the user: "All milestones for this goal are complete. Run `/porting-plan-goal` to define the next porting goal." and stop.

3. **Read porting-memory.md** — review the watch list and feature status. Note any items relevant to this milestone.