Individual skill
ds-ledger
Keep a one-row-per-decision log during long or unattended runs, and re-read it before each step so the run does not drift from its goal. Use for multi-phase or autonomous work, work a human will review later, or /ds-ledger.
skills/ds-ledger/SKILL.md
Source commit d4f1ebe72e8314c3a0c6135bb82f623c650f7218
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- Yes
- Observed behavior
- Not checked yet
- Last checked
- Nov 5, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 229
- Repository last updated
- Oct 28, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- agent-skills Repository topic
- claude-code Repository topic
- cline Repository topic
- deepseek Repository topic
- skills Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 1,695 bytes
Read excerpt
# ds-ledger
A long run forgets its own reasons. A short written ledger keeps the goal in view and lets a reviewer trust the result.
## Steps
1. Create one TSV file, for example `.ds-ledger.tsv`, with the header `ts phase decision why evidence result`. Put the goal and done condition in the first row.
2. Before each step, re-read the goal row and the last ten rows. Check that the next step still serves the goal. If it does not, log the drift and correct course.
3. After each real decision, append one row:
- ts: ISO 8601 time.
- phase: the phase or workstream.
- decision: what you chose or did, one line.
- why: the reason in plain words.
- evidence: a pointer, never prose. A commit hash, `file:line`, a command and its result, or an artifact path.