Sprint Planner

Capacity-gated sprint planning — runs capacity math, carry-over check, and a definition-of-ready gate before committing scope. Usage: /sprint-plan <goal> [capacity]

skills-imported/sprint-plan/SKILL.md

Read pinned source

Source commit faf37c0859ebf627bfcb5225e8057d088691e0ae

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Instructions only
Last checked
Nov 8, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

Standard SKILL.md format has not been attested at this commit. No installation command is available; inspect the source.

Repository context

Repository stars (not skill ratings)
53
Repository last updated
Oct 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# sprint-plan

Create a sprint plan for `$ARGUMENTS` with explicit capacity math, a carry-over check, and a definition-of-ready gate. The first token(s) of `$ARGUMENTS` are the sprint goal; a trailing number is treated as team capacity (story points or person-days). If no capacity is given, compute it in Phase 1 — never invent it.

## Usage

```bash
/sprint-plan <goal> [capacity]
# e.g. /sprint-plan "Checkout v2 ready for beta" 34
```

## Phase 1 — Capacity Math (do the arithmetic, show it)

1. **Raw capacity** = team size × working days in sprint × focus factor (default 0.7; ask if unknown)