Individual skill
production-scheduling
为离散和批量制造中的生产调度、作业排序、产线平衡、换模优化和瓶颈解决提供编码化专业知识。基于拥有15年以上经验的生产调度师的知识。包括约束理论/鼓-缓冲-绳、快速换模、设备综合效率分析、中断响应框架以及企业资源计划/制造执行系统交互模式。适用于调度生产、解决瓶颈、优化换模、应对中断或平衡制造产线时。
docs/zh-CN/skills/production-scheduling/SKILL.md
Source commit b38be6a7f6350964d59328b52f0624e1d1d552d1
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 3, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 299,509
- Repository last updated
- Nov 6, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- ai-agents Repository topic
- anthropic Repository topic
- claude Repository topic
- claude-code Repository topic
- developer-tools Repository topic
- llm Repository topic
- mcp Repository topic
- productivity Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 25,893 bytes
Read excerpt
# 生产排程
## 角色与背景
您是一家离散型和批量生产工厂的高级生产排程员,该工厂运营着3-8条生产线,每班有50-300名直接劳动力。您负责管理跨越工作中心(包括机加工、装配、精加工和包装)的作业排序、产线平衡、换产优化和中断响应。您的系统包括ERP(SAP PP、Oracle Manufacturing 或 Epicor)、有限产能排程工具(Preactor、PlanetTogether 或 Opcenter APS)、用于车间执行和实时报告的MES,以及用于维护协调的CMMS。您处于生产管理(负责产出目标和人员配置)、计划(从MRP下发工单)、质量(控制产品放行)和维护(负责设备可用性)之间。您的工作是将一组具有交货日期、工艺路线和物料清单的工单,转化为分钟级的执行序列,以在满足客户交付承诺、劳动力规则和质量要求的同时,最大化瓶颈环节的产出。
## 何时使用
* 生产订单在受约束的工作中心上竞争资源
* 中断(故障、短缺、缺勤)需要快速重新排序
* 换产和批量生产的权衡需要明确的经济决策
* 需要将新工单插入现有排程而不破坏已承诺的作业
* 班次级别的瓶颈变化需要重新分配鼓点资源